OPTIMIZING PROCUREMENT CYCLES FOR IMPROVED DELIVERY TRACKING IN CONSTRUCTION PROJECTS WITHIN SOUTH-SOUTH NIGERIA
Abstract
The construction industry in South-South Nigeria faces significant challenges in achieving timely and cost-effective project delivery, primarily due to inefficiencies in procurement cycles and delivery tracking systems. This study investigates the impact of procurement cycle times on delivery tracking in selected construction projects within the region, addressing key challenges, evaluating the role of optimized procurement processes, and proposing practical solutions. Utilizing a correlational research design, data were collected from 208 respondents across top, middle, and lower management levels in construction projects using a validated five-point Likert scale questionnaire. Findings reveal that procurement inefficiencies, including delayed decisions, inadequate vendor assessment, and lack of transparency, significantly contribute to supply chain disruptions and project delays. The linear regression analysis (R² = 0.986, p < 0.000) confirms a strong positive relationship between procurement cycle times and delivery tracking, rejecting the null hypothesis that procurement cycle times do not impact delivery tracking. Key challenges identified include logistical constraints, unreliable suppliers, and limited technological adoption. Optimized procurement processes enhance vendor selection, cost management, and delivery tracking accuracy, improving overall project performance. The study proposes adopting digital procurement platforms, real-time tracking technologies, standardized protocols, and capacity-building initiatives to address these challenges. These findings contribute to the body of knowledge on construction management in developing economies, offering actionable strategies to enhance procurement efficiency and delivery tracking in South-South Nigeria.
Downloads
References
Ajayi, O. O., Oyedepo, S. O., &Alabi, O. O. (2020). Building Information Modeling (BIM) adoption in the Nigerian construction industry: A review of challenges and opportunities. Journal of Engineering, Design and Technology, 18(5), 1053-1074. https://doi.org/10.1108/JEDT-07-2020-0269
Akintoye, A., & MacLeod, M. J. (2020). Risk management in construction projects: A systematic review of procurement practices. International Journal of Project Management, 38(7), 467-485. https://doi.org/10.1016/j.ijproman.2020.06.004
Ezeokoli, F. O., Ugochukwu, S. C., &Ogunsanmi, O. E. (2016). Appraisal of the use of information and communication technology (ICT) in material procurement in the Nigerian construction industry. Journal of Construction Engineering and Management, 5(2), 45-53.
Idoro, G. I. (2012). Influence of project procurement methods on project performance in the Nigerian construction industry. Journal of Sustainable Development, 5(7), 104-112.
Nguyen, Q., Tuan, T., & Nguyen, M. (2018). Procurement cycle in construction project management: The role of project delivery methods. Journal of Construction Engineering and Management, 144(4), 04018008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001511
Ogunmakinde, O. E., Akinola, A. A., &Siyanbola, A. B. (2018). Analysis of procurement methods in the Nigerian construction industry. Journal of Building Performance, 9(1), 1-10.
Ogunsanmi, O. E., Iyagba, R. O., &Omirin, M. M. (2010). A comparative study of procurement methods used in the Nigerian construction industry. The Built Environment Review, 3(2), 45-56.
Okoye, P. U., Ngwu, C., &Ugochukwu, S. C. (2015). Evaluation of the challenges of material management in the Nigerian construction industry. International Journal of Civil and Structural Engineering, 6(2), 123-130.
Oladapo, A. A. (2007). An investigation into the causes of project failure in the Nigerian construction industry. Journal of Construction Research, 8(1), 13-22.
Olatunji, O. A., &Ibem, E. O. (2021). Procurement management practices in Nigerian public construction projects: An empirical analysis. International Journal of Construction Management, 21(6), 681-693. https://doi.org/10.1080/15623599.2021.1897569
The authors and co-authors warrant that the article is their original work, does not infringe any copyright, and has not been published elsewhere. By submitting the article to GPH-International Journal of Social Science and Humanities Research, the authors agree that the journal has the right to retract or remove the article in case of proven ethical misconduct.