TECHNICAL AND ECONOMIC STUDY FOR IMPROVING ELECTRIC POWER GENERATION
Abstract
This study deals with the shortage of electrical power generation in Port Sudan town in Sudan in 2005, and tries to suggest a solution to this problem. Information on the existing power plant and the grid in the town was analyzed. in addition, an estimation of the power demand on the current grid and its future expansion for ten years was made. Options through which the generation can be improved were presented. The advantages and limitations of every option were discussed, and a combined cycle power plant was chosen. Economic analysis has been carried out for the combined cycle power plant, and finally, the study suggested that the appropriate option based on technical and economic aspects was to use a combined cycle power plant.
Downloads
References
[2] Sudan engineering society journal, January 1997, No. 34.
[3] National electricity corporation (Khartoum), statistical information,2001.
[4] National electricity corporation (Port Sudan), “Technical specificationfor Port Sudan Power Station”, 2004.
[5] Ministry of industry, statistical information, Apr. 2005.
[6] Statistical center (Port Sudan Office), “The growth of population inPort Sudan”, (1973 – 1993).
[7] National electricity corporation (Khartoum), the study of Port SudanPower station “A” case, December 2004.
[8] Port Sudan Refinery limited, (2005) “study Report”.
[9] Port Sudan treatment plant, commercial unit, March 2005.
[10] Institution of Diesel and gas turbine engineer’s Annual workingcost and report.
[11] Khartoum Refinery Company, Private Communication –(2005).
[12] Onkar Singh, “Applied thermodynamics” New age international(P) limited, 2003.
[13] G.D. RAI, power plant technology, published by Ramesh chandler, 1989.
[14] T.D Eastop and A.McConkey, “Applied Thermodynamics forengineering technologists”, published by united states with JohnWiley and Sons, 1994.
[15] John A. White, Marvin H. Agee, Kenneth E. case “Principles ofengineering economic analysis”, published by JohnWiley and sons,1989.
[16] www.necsudan.com
[17] www.google.com/priceof combined-cycle power plant
[18] www.yahoo.com/ price of combined-cycle power plant for sale
about (300MW).
[19] www.yahoo.com/ advantages and disadvantages of gas turbine.
[20] www.yahoo.com/combined cycle power plant technology.
[21] Osama Mohammed Elmardi Suleiman Khayal, (1990). Feasibility study of construction of machining shop in industrial area Atbara, Nile Valley University, Sudan.
Copyright (c) 2019 GPH - International Journal of Electrical And Electronics Engineering →

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Author(s) and co-author(s) jointly and severally represent and warrant that the Article is original with the author(s) and does not infringe any copyright or violate any other right of any third parties, and that the Article has not been published elsewhere. Author(s) agree to the terms that the GPH Journal will have the full right to remove the published article on any misconduct found in the published article.